What data the calculation needs

Only load profiles are required. Everything else widens the range of findings and makes them more reliable. Data are accepted in the form the metering system exports them.

1. Load profiles required

WhatRequirement
Consumer metersactive energy, import (A+), with timestamps; desirable — export (A−) and reactive energy
Substation input (balance) metersame period and interval as the consumers; desirable — voltage on the 0.4 kV busbar
Interval30 or 60 minutes; data are used at the interval they were recorded, without resampling
Periodthe same for the input and the consumers; the more samples, the more confident the conclusion; if there are too few, GRID-IN reports it per substation
Identificationmeter serial number in every row or column
Timestampstate whether it marks the start or the end of the interval, and the time zone
Gapsleave empty; do not replace with zeros — zero means “no consumption”
UnitskWh or kW, with or without the CT ratio applied — state which

2. Metering records and register desirable

WhatPurpose
Balance groups: substation → metersif absent, GRID-IN assembles the groups itself; if present, it verifies them
Consumer register: meter, address, account, CT ratiotarget addresses, reconciliation of metering with the register
Monthly billing per accountbilling analysis; reconciliation of profiles with billing
Meter event logsevent analysis: tampering, outages, faults
Coordinates or addresses of substations and consumersmap, field groups, route

3. 0.4 kV network diagram desirable

Needed for network state and technical losses (GRIDTO) and to show targets on the diagram.

Consumer phasing, node voltages and refined line lengths are determined by GRID-IN itself. The diagram can be drawn in the GRID-IN editor on a map or uploaded as a file.

4. Formats

Enough for a pilot: an export of consumer and input meter profiles for several substations over one period. If available — add the register with addresses, billing, event logs and the diagrams of these substations.