Low-voltage network monitoring from smart meter data

The 0.4 kV network is the largest and the “darkest” part of distribution. Network management systems usually stop at the 6(10)/0.4 kV substation, and what happens on the lines from the substation to the consumer is not visible. Yet smart meters at consumers and at substation inputs are already installed and report every hour. GRID-IN turns that data into network monitoring — with no new sensors or measuring devices.

What does the metering system not show?

AMI was built for billing. It tells how much each meter consumed and what the substation imbalance is. It does not answer the questions a distribution operator needs:

What does GRID-IN add?

QuestionGRID-IN answer
What are the losses really?the imbalance of every substation for the period and by hour
What should they be?technical losses from the network diagram: transformer and every overhead and cable section
Where is energy lost above technical losses?a field inspection target list: address, meter, type of irregularity, energy estimate, confirmation probability
Is the network overloaded?section loading against the continuous current rating
What voltage do consumers get?voltages at nodes and at consumers, voltage drop to remote ones
Do the records match the network?meters of another substation, houses on the map with no service connection on the diagram, consumer phasing

Why not measure voltages in the network?

Finding theft from node voltages requires very precise instruments. Example: a 1 kW load (about 5 A) on a 50 m span of aerial bundled cable with a 50 mm² core causes a voltage drop of about 0.16 V — less than a tenth of a percent of 230 V. Finding such a point needs synchronised voltage measurements with an accuracy ordinary meters do not have. GRID-IN does not need such measurements: it works from the data the metering system already collects.

What makes up the imbalance?

When the metering is in order, the substation imbalance has three parts: meter error, technical losses and non-technical losses. Meter error follows from the accuracy class, technical losses are calculated from the diagram, and the rest is non-technical losses to be found at specific addresses. When the metering is not in order, metering errors are added on top — GRID-IN shows them separately (see Substation imbalance).

How is it deployed?

Inputs — Data requirements; how it is built — System description.